eng
All categories
Brussels
Selling gas turbine SGT400 operating time 6000 hours
Selling gas turbine SGT400 operating time 6000 hours - photo 1
Renewed: 24 October 2020, 16:03

Selling gas turbine SGT400 operating time 6000 hours

$5,800,000/piece
Delivery terms: EXW Belgorod
Фиатов Геннадий
инженер консультант
,  Belgorod, RU
Flagma member since 18 April 2015

Description

Selling second-hand SGT400 gas turbine.
Manufactured in 2014.
Operating time - 6000 hours.
The condition is perfect.
Application - power plant.
Fuel - dual fuel (natural gas / diesel)
The current frequency is 50 Hz.
Completeness - full set: power turbine + transition channel + gas compressor + all auxiliary systems.
Reducer and generator are available.
The SGT400 gas turbine was serviced on time, according to the Siemens service schedule.
The gas turbine is in safekeeping, conservation has been carried out.
The equipment is ready for sale.
Our company offers its services for the installation and start-up of this turbine.
We accept Siemens gas turbine engines for repair.
We carry out all types of Inspections and develop the Terms of Reference.
All questions about the turbine will be answered by the engineer on duty.
Call WhatsApp

Ad number: 1731665   |  views: 1  
,  Belgorod, RU
Flagma member since 18 April 2015
Still looking for:

Similar ads

Liquefied petroleum gas
Price on request
Petroleum Operating, Branch, KZ, 34 km +19 ads
- Liquefied gas (Naip terminal) according to the formula rates "Platt's” "FOB AG Cargoes" "Propane" 40% plus "Butane" 60% discount, prize...
Test bench gas turbine engine SOLAR
$1,600,000/pc CIP
Stanok expert, LLC, RU, 63 km +32 ads
Production, sale. Test bench of industrial gas turbine engines manufactured by SOLAR used in gas compressor stations and power plants. Models:...
Test bench gas turbine engine Rolls-Royce
$1,600,000/pc CIP
Stanok expert, LLC, RU, 63 km +32 ads
Production, sale. Test bench of industrial GTE firms Rolls-Royce used in gas compressor stations and power plants. Rolls-Royce models: Avon,...
Equipment for the repair of gas-turbine engines gas pipeline
$1,600,000/Комплект (компл) CIP
Stanok expert, LLC, RU, 63 km +32 ads
Completion of an enterprise for the repair of industrial gas-turbine engines used in gas-compressor stations: - gas-compressor stations:...
Show more
Contact the company
Фиатов Геннадий
инженер консультант
By phone
In messenger
Say, that you found an ad on Flagma
Safety rules: Do not agree to a prepayment if you are not sure about the reliability of the company.
Write a message
Select category
×
Login to your account